- [ Things to consider when planning a new Swimming Pool ] -
- [ What is involved in building a Block Wall and Vinyl Liner Swimming Pool ] -
- [ What is involved in building a Concrete Block and Tile Swimming Pool ] -
- [ Delivery Information and costs for Swimming Pool Kits ] -
- [ Pricelist for Block Wall and Vinyl Liner Construction Swimming Pool Kits ] -
- [ Pricelist for Concrete Render and Tile Construction Swimming Pool Kits ] -
- [ Clearwater Swimming Pool Design Service ] -
.....................................................................................................................................................
- [ Last Page ] - [ Back ] - [ Home ] - [ Site Map ] - [ Swimming Pool Gallery ] -
.....................................................................................................................................................

To Do It Yourself : briefly what is involved in building a concrete render and tile swimming pool
 
The pool is laid out and excavated.
The bottom of the pool is covered
in 75mm of 50mm clean gravel.
The main drain and pipes are installed
and a layer of lean mix concrete is laid
over the entire base area 75mm thick.
Using the Clearwater special blocks,
called E blocks,
the first layer of blocks are laid.
 
     
The walls are built up using Clearwater Special blocks and the reinforced steel added. As the walls are built up the pool fittings are added such as return inlet and surface skimmers and underwater lights. Once the walls are built up to the required height back filling with pea shingle can commence.
 
The steelwork is laid to the required shape in the walls and for the floor. Backfilling can now commence but only taken up to the bottom of the pipes. The rest of the pipework should now be fitted and plumbed back to the filter house, along with any electric. Backfiring can then be completed.
 
Once all the steel work and pipework is in position, the concrete can be pored for the walls and floor, if you are using a pump you must ask for a pump mix.
 
The concrete should be vibrated and tamped into position to create a dense structure with no air pockets. This tamping should be carried out as accurately as possible, as a good result will help when applying the pool finished/tiling.
Next the copings must be cemented around the pool so that the walls can be rendered up to them. The copings should protrude 25mm over the inside of the pool wall to allow for the rendering and mosaic. Take particular care to make the coping perfect as this is one of the most important operations of the pool construction.

A Waterproofing system should be applied once the pool copings are laid, this is the most important part of a swimming pools integrity. The pool is then rendered and the floor screeded ready for tiling

Clearwater Swimming Pools have a full range of tiles for the internal surface of the swimming pool. Please see our Tile Samples page for details
 
Detail Drawings for Clearwater Special Concrete Block pool building system
 
 
If you do not require Clearwater Special Blocks please see below the drawing using solid blocks.
 
 
 
 
 
 
 

- [ Top of Page ] -
.....................................................................................................................................................
- [ Things to consider when planning a new Swimming Pool ] -
- [ What is involved in building a Block Wall and Vinyl Liner Swimming Pool ] -
- [ What is involved in building a Concrete Block and Tile Swimming Pool ] -
- [ Delivery Information and costs for Swimming Pool Kits ] -
- [ Pricelist for Block Wall and Vinyl Liner Construction Swimming Pool Kits ] -
- [ Pricelist for Concrete Render and Tile Construction Swimming Pool Kits ] -
- [ Clearwater Swimming Pool Design Service ] -
.....................................................................................................................................................
- [ Last Page ] - [ Back ] - [ Home ] - [ Site Map ] - [ Swimming Pool Gallery ] -
.....................................................................................................................................................


Clearwater Swimming Pools Ltd. The Studio, 81 Langley Close, Headington, Oxford. OX3 7DB
enquiries@clearwater-pools.co.uk

Copyright © Clearwater Pools Ltd. 99, 00
All rights reserved.